What this guide decides
Combine technical needs, commercial terms, documents and acceptance criteria into one controlled package before issuing the RFQ.
Executive summary
- Main decision: Combine technical needs, commercial terms, documents and acceptance criteria into one controlled package before issuing the RFQ.
- Comparison basis: Record datasheet or BOM, standard and grade, dimensions and quantity, inspection, MTC, price and unit, taxes, delivery, packaging, payment and claims.
- First risk: Using commercial names in RFQs
What decision are you making?
Steel procurement links requirement definition, comparable quotations, supplier evaluation, ordering, inspection, transport and acceptance. Errors at one stage pass into the next. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]
When importing steel from Iran, price differences often reflect weight basis, local tax treatment, delivery location, cutting, packing, freight, quote validity and documentation. Keep one order, lot and acceptance reference from RFQ through discharge and any claim. Specify settlement currency, the named port or final delivery place, inspection language and destination project requirements. Ask the responsible parties to confirm applicable border charges and documents for the actual shipment rather than assuming that an Iranian domestic quote represents the importer's landed cost.
Technical mechanism and price impact
Vague RFQs produce incomparable bids; incomplete purchase orders complicate claims, and acceptance without hold points can destroy traceability once material is consumed.[2][3][4]
Record datasheet or BOM, standard and grade, dimensions and quantity, inspection, MTC, price and unit, taxes, delivery, packaging, payment and claims. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.
Request comparable quotations
Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:
- Approved engineering requirement
- Identical RFQ basis
- Technical and commercial evaluation
- ITP and documents
- Delivery and acceptance plan
Compare the options
Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.
| Direct mill purchase | Volume and lead time fit | Minimum order and production schedule |
| Stockholder or trader | Speed and variety are needed | Origin and lot |
| Combined sourcing | Time and price risks are shared | Clear specification separation |
Common risks and warning signs
Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Using commercial names in RFQs; Comparing different supply scopes; PO without rejection criteria; Unloading before inspection. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.
A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.
Make the purchasing decision
A useful checklist removes ambiguity before it becomes project downtime, keeping decisions focused and timely.[4][5]
Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.
Checklist before you order
- 1Approved engineering requirement
- 2Identical RFQ basis
- 3Technical and commercial evaluation
- 4ITP and documents
- 5Delivery and acceptance plan
- 6Record the price basis, unit, taxes, loading and freight in the quotation
- 7Match shipment markings and documents to the delivered goods before unloading
Frequently asked questions
What should I check first when evaluating steel procurement?
Align the product definition and acceptance criteria before comparing prices. Record datasheet or BOM, standard and grade, dimensions and quantity, inspection, MTC, price and unit, taxes, delivery, packaging, payment and claims.
Is price alone enough to decide on steel procurement?
No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. A useful checklist removes ambiguity before it becomes project downtime, keeping decisions focused and timely.
Sources and how they were used
Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.
- [1]Iranian national standards and services— Iran National Standards Organization
- [2]ISO/TC 17 — Steel— International Organization for Standardization
- [3]Steel Standards— ASTM International
- [4]Iran Mercantile Exchange physical-market trading statistics— Iran Mercantile Exchange
- [5]Steel & Metals Price Assessment Methodology— S&P Global Energy — Platts