Benchmarks and global markets

What is Platts? Reading steel price assessments

What is Platts? Reading steel price assessments: a practical guide to specifications, price comparison and quality checks for steel buyers.

Zharfahan Editorial5 min read
Zharfahan editorial illustration: A precision market scale weighs steel samples only after they pass a specification gauge.

What this guide decides

Identify the exact product, quality, location, timing and trade terms represented by an assessment before comparing it with your purchase.

Executive summary

  • Main decision: Identify the exact product, quality, location, timing and trade terms represented by an assessment before comparing it with your purchase.
  • Comparison basis: Record assessment name and symbol, product, grade or analysis, dimensions, price unit, origin and destination, Incoterm, loading window, assessment time and treatment of taxes or duties.
  • First risk: Using an unrelated benchmark

What decision are you making?

Platts publishes commodity price assessments and market specifications through S&P Global Commodity Insights. Each symbol has a defined technical and commercial basis. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]

For buyers comparing Iranian supply with international benchmarks, align product, grade, dimensions, assessment date, currency and delivery basis before discussing a premium or discount. Request an offer in the executable settlement currency at a named port or final delivery location, and show freight, insurance, handling, applicable charges and financing separately. Confirm destination acceptance of the material and documents. Iranian exchange and stockholder data can explain domestic supply conditions, but neither a benchmark nor a domestic quote is itself an executable export offer.

Technical mechanism and price impact

Assessments use collected and verified market information, normalizing differences such as quality, location, timing and delivery terms. They need not equal a simple average of all trades or the latest observed offer, and should be read with the specifications and assessment rationale.[2][3][4]

Record assessment name and symbol, product, grade or analysis, dimensions, price unit, origin and destination, Incoterm, loading window, assessment time and treatment of taxes or duties. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.

Request comparable quotations

Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:

  • Full assessment name and symbol
  • Current specification-guide edition
  • Assessment location and time
  • Units and currency
  • Delivery terms and loading window

Compare the options

Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.

Closely matched benchmarkProduct and terms resemble the specificationEvery specification parameter
Reference with adjustmentsNo direct local benchmark existsDocumented quality, freight, currency and financing bridge
Independent domestic priceTrade constraints or local scarcity dominateActual trades, IME records and current quotes

Common risks and warning signs

Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Using an unrelated benchmark; Omitting basis-conversion costs; Confusing assessment with prediction; Quoting without date or symbol. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.

A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.

Make the purchasing decision

Read the definition before the number. For Iranian supply, use the assessment as a baseline and build a transparent bridge to replacement cost or an actual domestic or export offer.[4][5]

Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.

Checklist before you order

  1. 1Full assessment name and symbol
  2. 2Current specification-guide edition
  3. 3Assessment location and time
  4. 4Units and currency
  5. 5Delivery terms and loading window
  6. 6Record the price basis, unit, taxes, loading and freight in the quotation
  7. 7Match shipment markings and documents to the delivered goods before unloading

Frequently asked questions

What should I check first when evaluating Platts price assessments?

Align the product definition and acceptance criteria before comparing prices. Record assessment name and symbol, product, grade or analysis, dimensions, price unit, origin and destination, Incoterm, loading window, assessment time and treatment of taxes or duties.

Is price alone enough to decide on Platts price assessments?

No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. Read the definition before the number. For Iranian supply, use the assessment as a baseline and build a transparent bridge to replacement cost or an actual domestic or export offer.

Sources and how they were used

Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.

  1. [1]Steel & Metals Price Assessment MethodologyS&P Global Energy — Platts
  2. [2]Platts Assessments Methodology GuideS&P Global Commodity Insights
  3. [3]Global Steel, Ferrous Scrap, Ferroalloys and Noble Alloys Specifications GuideS&P Global Commodity Insights
  4. [4]World Steel in Figures 2026World Steel Association
  5. [5]Iran Mercantile Exchange physical-market trading statisticsIran Mercantile Exchange

Where to go next

Related guides to support your next buying decision.

Zharfahan editorial illustration: A mechanical time window admits only transparent steel-market offers.Global markets

Decision guide · 5 min

How Platts Market on Close works

Market on Close, or MOC, organizes market information around a specified assessment time so verifiable bids, offers and trades can be compared on defined terms. Understand why timing, executability and transparent offers matter at the assessment close, and the limits of conclusions drawn from one MOC value.

Read the guide
Zharfahan editorial illustration: An industrial gearbox transforms a global benchmark through currency and logistics into a domestic price model.Global markets

Decision guide · 5 min

Connecting global steel prices with the Iranian market

Translating global prices to Iran involves more than currency conversion. Choose the appropriate product and basis, then account for trade costs, executable currency, timing, constraints and domestic supply. Build an auditable model linking global assessments to replacement cost and domestic prices without presenting it as a certain forecast.

Read the guide