What this guide decides
Map each product's actual materials, energy, yield, transport and conversion, then assess global-price effects on a comparable basis.
Executive summary
- Main decision: Map each product's actual materials, energy, yield, transport and conversion, then assess global-price effects on a comparable basis.
- Comparison basis: Record route, bill of materials, units, moisture and grade basis, yield at each stage, energy, freight, exchange rate, inventory and transmission lag.
- First risk: Passing through benchmarks one-for-one
What decision are you making?
Steel cost includes different shares of ore, pellets, DRI or scrap, ferroalloys, electrodes, energy, refractories, labor, capital and transport across production routes. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]
For international buyers assessing Iranian steel, connect production-route information to the actual mill, product and shipment. Compare raw-material costs, energy exposure and environmental data on consistent units and boundaries, then add the agreed settlement currency, freight and named destination. Request product-specific evidence where the customer's project requires emissions, quality or traceability reporting; an industry average or technology label cannot stand in for the offered material's verified data. Build delivery and inventory scenarios around the supplier's confirmed production plan.
Technical mechanism and price impact
BOF and EAF routes use different feedstock and energy baskets. Yield, grade, metallization and by-products mean a dollar change in feedstock does not transfer one-for-one to each tonne of finished steel.[2][3][4]
Record route, bill of materials, units, moisture and grade basis, yield at each stage, energy, freight, exchange rate, inventory and transmission lag. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.
Request comparable quotations
Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:
- Mill production route
- Specific consumption
- Feedstock price basis
- Freight and currency
- Sensitivity analysis
Compare the options
Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.
| Ore or DRI route | These feedstocks and energy dominate | Metallization and gas |
| Scrap and EAF route | Scrap and electricity dominate | Charge basket and yield |
| Rolled products | Semifinished steel and conversion dominate | Scrap losses and capacity |
Common risks and warning signs
Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Passing through benchmarks one-for-one; Omitting yield; Mixing dry and wet basis; Ignoring previously purchased inventory. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.
A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.
Make the purchasing decision
Make cost maps specific to the mill and product. A global benchmark is a scenario input, not a ready-made Iranian market or export price.[4][5]
Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.
Checklist before you order
- 1Mill production route
- 2Specific consumption
- 3Feedstock price basis
- 4Freight and currency
- 5Sensitivity analysis
- 6Record the price basis, unit, taxes, loading and freight in the quotation
- 7Match shipment markings and documents to the delivered goods before unloading
Frequently asked questions
What should I check first when evaluating steel value-chain cost structure?
Align the product definition and acceptance criteria before comparing prices. Record route, bill of materials, units, moisture and grade basis, yield at each stage, energy, freight, exchange rate, inventory and transmission lag.
Is price alone enough to decide on steel value-chain cost structure?
No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. Make cost maps specific to the mill and product. A global benchmark is a scenario input, not a ready-made Iranian market or export price.
Sources and how they were used
Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.
- [1]World Steel in Figures 2026— World Steel Association
- [2]Raw materials— World Steel Association
- [3]Life cycle assessment in the steel industry— World Steel Association
- [4]Iran Mercantile Exchange physical-market trading statistics— Iran Mercantile Exchange
- [5]Global Steel, Ferrous Scrap, Ferroalloys and Noble Alloys Specifications Guide— S&P Global Commodity Insights