What this guide decides
Compare feedstocks, energy, scale, product quality, emissions and infrastructure without assigning an unconditional ranking.
Executive summary
- Main decision: Compare feedstocks, energy, scale, product quality, emissions and infrastructure without assigning an unconditional ranking.
- Comparison basis: Normalize feed origin, specific energy, yield, capacity utilization, product mix, capital cost, emissions boundary, water and infrastructure.
- First risk: Comparing different emissions boundaries
What decision are you making?
BF-BOF production mainly uses coke to reduce ore to hot metal before refining it into steel. EAF production melts metallic feed such as scrap and DRI using electricity. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]
For international buyers assessing Iranian steel, connect production-route information to the actual mill, product and shipment. Compare raw-material costs, energy exposure and environmental data on consistent units and boundaries, then add the agreed settlement currency, freight and named destination. Request product-specific evidence where the customer's project requires emissions, quality or traceability reporting; an industry average or technology label cannot stand in for the offered material's verified data. Build delivery and inventory scenarios around the supplier's confirmed production plan.
Technical mechanism and price impact
Each route has different material, energy and emissions systems. Scrap quality, power source, DRI reduction, capacity and actual operation change economic and environmental results.[2][3][4]
Normalize feed origin, specific energy, yield, capacity utilization, product mix, capital cost, emissions boundary, water and infrastructure. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.
Request comparable quotations
Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:
- System boundary
- Mass and energy data
- Electricity mix
- Product quality
- Capacity and availability
Compare the options
Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.
| BF-BOF | Ore supply, scale and products suit | Coke and emissions |
| Scrap-based EAF | Scrap and power are available | Residuals and electricity supply |
| DRI-based EAF | Clean iron units and suitable energy are available | Reduction and power |
Common risks and warning signs
Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Comparing different emissions boundaries; Omitting scrap quality; Assuming low-carbon electricity; Ignoring scale. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.
A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.
Make the purchasing decision
Use consistent boundaries and data. The suitable route depends on local resources and the intended product.[4][5]
Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.
Checklist before you order
- 1System boundary
- 2Mass and energy data
- 3Electricity mix
- 4Product quality
- 5Capacity and availability
- 6Record the price basis, unit, taxes, loading and freight in the quotation
- 7Match shipment markings and documents to the delivered goods before unloading
Frequently asked questions
What should I check first when evaluating BF-BOF and EAF steelmaking?
Align the product definition and acceptance criteria before comparing prices. Normalize feed origin, specific energy, yield, capacity utilization, product mix, capital cost, emissions boundary, water and infrastructure.
Is price alone enough to decide on BF-BOF and EAF steelmaking?
No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. Use consistent boundaries and data. The suitable route depends on local resources and the intended product.
Sources and how they were used
Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.
- [1]World Steel in Figures 2026— World Steel Association
- [2]Raw materials— World Steel Association
- [3]Life cycle assessment in the steel industry— World Steel Association
- [4]Iran Mercantile Exchange physical-market trading statistics— Iran Mercantile Exchange
- [5]Global Steel, Ferrous Scrap, Ferroalloys and Noble Alloys Specifications Guide— S&P Global Commodity Insights