What this guide decides
Compare emissions only after aligning product, functional unit, boundary, allocation, electricity, recycling credits and data quality.
Executive summary
- Main decision: Compare emissions only after aligning product, functional unit, boundary, allocation, electricity, recycling credits and data quality.
- Comparison basis: Record functional unit, product and grade, boundary and modules, standard and PCR, primary data, electricity, allocation, recycling approach, data year and site, and verification.
- First risk: Comparing different boundaries
What decision are you making?
LCA accounts for inputs and outputs within a defined life-cycle boundary. Carbon footprint is one assessment indicator; an EPD provides a verified format for declaring product environmental data. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]
For international buyers assessing Iranian steel, connect production-route information to the actual mill, product and shipment. Compare raw-material costs, energy exposure and environmental data on consistent units and boundaries, then add the agreed settlement currency, freight and named destination. Request product-specific evidence where the customer's project requires emissions, quality or traceability reporting; an industry average or technology label cannot stand in for the offered material's verified data. Build delivery and inventory scenarios around the supplier's confirmed production plan.
Technical mechanism and price impact
Cradle-to-gate or cradle-to-grave scope, slag and scrap allocation, electricity mix and mill data change the result. Scrap percentage alone cannot establish emissions.[2][3][4]
Record functional unit, product and grade, boundary and modules, standard and PCR, primary data, electricity, allocation, recycling approach, data year and site, and verification. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.
Request comparable quotations
Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:
- Unit and boundary
- Data year and location
- Scrap accounting method
- Electricity factor
- Third-party verification
Compare the options
Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.
| Mill report | The decision concerns that site | Data and verification |
| Product EPD | Contractual comparison is required | PCR and modules |
| Industry average | An initial estimate is needed | Uncertainty |
Common risks and warning signs
Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Comparing different boundaries; Green claims without a baseline; Double-counting recycling; Industry data replacing mill data. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.
A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.
Make the purchasing decision
A carbon number needs its boundary and method to be comparable. Request transparent assumptions alongside the headline value.[4][5]
Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.
Checklist before you order
- 1Unit and boundary
- 2Data year and location
- 3Scrap accounting method
- 4Electricity factor
- 5Third-party verification
- 6Record the price basis, unit, taxes, loading and freight in the quotation
- 7Match shipment markings and documents to the delivered goods before unloading
Frequently asked questions
What should I check first when evaluating steel life-cycle assessment?
Align the product definition and acceptance criteria before comparing prices. Record functional unit, product and grade, boundary and modules, standard and PCR, primary data, electricity, allocation, recycling approach, data year and site, and verification.
Is price alone enough to decide on steel life-cycle assessment?
No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. A carbon number needs its boundary and method to be comparable. Request transparent assumptions alongside the headline value.
Sources and how they were used
Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.
- [1]World Steel in Figures 2026— World Steel Association
- [2]Raw materials— World Steel Association
- [3]Life cycle assessment in the steel industry— World Steel Association
- [4]Iran Mercantile Exchange physical-market trading statistics— Iran Mercantile Exchange
- [5]Global Steel, Ferrous Scrap, Ferroalloys and Noble Alloys Specifications Guide— S&P Global Commodity Insights