What this guide decides
Define semifinished material by section, grade, rolling route, internal quality and downstream equipment dimensions.
Executive summary
- Main decision: Define semifinished material by section, grade, rolling route, internal quality and downstream equipment dimensions.
- Comparison basis: Record section definition and dimensions, grade, casting route, surface conditioning, internal quality, length and weight, heat identity and intended destination line.
- First risk: Ambiguous semifinished-steel names
What decision are you making?
Billets, blooms and slabs have different dimensional proportions and rolling destinations; naming boundaries should follow the standard or contract. Evaluate technical specifications, the price basis, delivery terms and quality evidence together. A lower number is not a comparable offer if it covers a different grade, weight, coating or delivery scope.[1][2]
For international buyers assessing Iranian steel, connect production-route information to the actual mill, product and shipment. Compare raw-material costs, energy exposure and environmental data on consistent units and boundaries, then add the agreed settlement currency, freight and named destination. Request product-specific evidence where the customer's project requires emissions, quality or traceability reporting; an industry average or technology label cannot stand in for the offered material's verified data. Build delivery and inventory scenarios around the supplier's confirmed production plan.
Technical mechanism and price impact
Casting section, speed, cooling and downstream reduction affect segregation, cracks, porosity and final quality. Slabs feed flat products, while square or rectangular sections feed long products.[2][3][4]
Record section definition and dimensions, grade, casting route, surface conditioning, internal quality, length and weight, heat identity and intended destination line. Compare offers only after aligning units, the weight basis, taxes, packaging, loading, freight and quote validity. An omitted cost can outweigh the apparent saving per kilogram. Keep the supplier’s currency and payment date visible before converting to your purchasing currency.
Request comparable quotations
Ask every supplier to answer the same written specification. This prevents an apparently cheaper offer from silently changing the product or scope. Confirm the following before comparing prices:
- Section and tolerance
- Grade and heat
- Surface and scarfing
- Macro examination or UT where required
- Receiving-line compatibility
Compare the options
Use this table to structure the decision. It does not replace engineering calculations or the contract. The final column identifies the evidence to review before accepting an offer.
| Billet | Smaller-section long products | Dimensions and center quality |
| Bloom | Larger or heavier sections | Reduction and internal defects |
| Slab | Plate, sheet and coil | Width, thickness and surface |
Common risks and warning signs
Errors often begin when a trade name replaces a technical specification, one photograph stands for an entire shipment, or the delivery scope is missing from the quote. Address these specific risks: Ambiguous semifinished-steel names; Corner cracks; Centerline segregation; Incompatibility with furnace or mill. Turn each risk into a written acceptance criterion, sampling requirement or traceable document.
A standard number alone does not demonstrate conformity. Specify the edition, grade, dimensions, tolerances, test method, heat or batch number and acceptance authority. For an import project, confirm the destination’s requirements and the project’s approved specification; an Iranian market designation is not automatic evidence of an equivalent local grade.
Make the purchasing decision
Semifinished steel is too broad an ordering description. State geometry and rolling destination alongside grade.[4][5]
Before ordering, prepare a single comparison sheet covering the product, quantity, unit, theoretical and actual weight, base price, taxes, freight, delivery window, documents and acceptance criteria. Identify who pays each cost and who records discrepancies at receipt. This makes the negotiation clearer and gives the receiving team an agreed basis for checking the shipment.
Checklist before you order
- 1Section and tolerance
- 2Grade and heat
- 3Surface and scarfing
- 4Macro examination or UT where required
- 5Receiving-line compatibility
- 6Record the price basis, unit, taxes, loading and freight in the quotation
- 7Match shipment markings and documents to the delivered goods before unloading
Frequently asked questions
What should I check first when evaluating semifinished steel products?
Align the product definition and acceptance criteria before comparing prices. Record section definition and dimensions, grade, casting route, surface conditioning, internal quality, length and weight, heat identity and intended destination line.
Is price alone enough to decide on semifinished steel products?
No. Prices are comparable only when grade, dimensions, weight, quality, documents, delivery scope and validity match. Semifinished steel is too broad an ordering description. State geometry and rolling destination alongside grade.
Sources and how they were used
Standards and primary sources define the method, terminology and scope of each decision. The project’s contractual edition and the approved national standard always take precedence.
- [1]World Steel in Figures 2026— World Steel Association
- [2]Raw materials— World Steel Association
- [3]Life cycle assessment in the steel industry— World Steel Association
- [4]Iran Mercantile Exchange physical-market trading statistics— Iran Mercantile Exchange
- [5]Global Steel, Ferrous Scrap, Ferroalloys and Noble Alloys Specifications Guide— S&P Global Commodity Insights


